First Point recently added two new members to our chiller division, with 24-30 years' experience each and are both factory trained on ArcticCool by The Arctic Chiller Group and Smardt brand chiller -both of which utilize oil-free, variable speed compressors and magnetic (nearly frictionless) bearings.
Meet First Point Mechanical's Chiller Division Team:
JIM K.:
PAUL S.:
ADAM G.:
DON M.:
RICH M.:
HAYDEN S.:
PAUL S.:
LOYOLA ACADEMY
Wilmette, IL
PROJECT DESCRIPTION
Reduce energy costs, enhance comfort controls and reduce equipment footprint
THE CHALLENGE
With only two existing thermostats for over 14 classrooms and offices, Loyola Academy was looking for a better way to control the temperature in each classroom and office. Being located in the basement, the new system also had to be able to dehumidify to maximize its' occupants comfort.
THE SOLUTION
With limited space above the ceilings, Loyola Academy and First Point's engineers worked together to find a system that would meet both the space limitations and provide additional comfort controls to the teaching staff.
THE RESULT
First Point Mechanical designed and installed the Mitsubishi VRF system that provides each classroom and office simultaneous heating and cooling . This project turned two thermostats into 14 individual controlled zones! This project also freed up mechanical room space and allowed the building to utilize this additional space for storage and classroom use.