Connect: 

 

PROJECTS

ANDREW HUTTER

Service Technician

WHAT IS ONE CAREER LESSON YOU HAVE LEARNED THUS FAR?
Always double check your work

WHAT ASPECT OF YOUR ROLE DO YOU ENJOY THE MOST?
Fixing problems for customers

IF YOU COULD DO ANOTHER JOB FOR JUST ONE DAY, WHAT WOULD IT BE?
A Pilot

WHAT DID YOU WANT TO BE GROWING UP?
A Chemist

WHAT ASPECT OF YOUR ROLE DO YOU ENJOY THE MOST?
Fixing problems for customers

WHAT IS ON YOUR BUCKET LIST?
Tour Europe

IF YOU COULD HAVE ONE SUPER HERO-TYPE POWER, WHAT WOULD IT BE?
The ability to instantly transport anywhere

WHAT IS THE ONE THING YOU CAN'T LIVE WITHOUT?
Water

WHAT IS ONE CAREER LESSON YOU HAVE LEARNED THUS FAR?
Always double check your work

WHAT ASPECT OF YOUR ROLE DO YOU ENJOY THE MOST?
Fixing problems for customers

IF YOU COULD DO ANOTHER JOB FOR JUST ONE DAY, WHAT WOULD IT BE?
A Pilot

WHAT DID YOU WANT TO BE GROWING UP?
A Chemist

WHAT ASPECT OF YOUR ROLE DO YOU ENJOY THE MOST?
Fixing problems for customers

WHAT IS ON YOUR BUCKET LIST?
Tour Europe

IF YOU COULD HAVE ONE SUPER HERO-TYPE POWER, WHAT WOULD IT BE?
The ability to instantly transport anywhere

WHAT IS THE ONE THING YOU CAN'T LIVE WITHOUT?
Water

LOYOLA ACADEMY
Wilmette, IL

PROJECT DESCRIPTION
Reduce energy costs, enhance comfort controls and reduce equipment footprint

THE CHALLENGE
With only two existing thermostats for over 14 classrooms and offices, Loyola Academy was looking for a better way to control the temperature in each classroom and office.  Being located in the basement, the new system also had to be able to dehumidify to maximize its' occupants comfort. 

THE SOLUTION
With limited space above the ceilings, Loyola Academy and First Point's engineers worked together to find a system that would meet both the space limitations and provide additional comfort controls to the teaching staff. 

THE RESULT
First Point Mechanical designed and installed the Mitsubishi VRF system that provides each classroom and office simultaneous heating and cooling .  This project turned two thermostats into 14 individual controlled zones!  This project also freed up mechanical room space and allowed the building to utilize this additional space for storage and classroom use.

LOYOLA ACADEMY
Wilmette, IL

In partnership with Loyola Academy, First Point was successfully able to reduce energy costs, enhance comfort controls and reduce equipment footprint. 

MORE PROJECTS COMING SOON!

Committed to be well known in our industry for our high quality customer service, integrity, & honesty

•  Home
•  About Us
•  Solutions
•  Markets
•  Portal
•  Contact Us

1625 Winnetka Circle
Rolling Meadows, IL 60008
847.483.8080 phone
847.483.8079 fax
info@firstpointmechanical.com

Connect: 

 

Click to add text...